Decision Support Systems, Data Mining, Supply Chain Solutions from Decisioncraft Analytics


HOME WHY DECISIONCRAFTCASE STUDIES
CASE STUDY: Scheduling and Optimization
 


Project Objective
To develop a scalable scheduling optimization application that will ensure minimal costs and uniform resource scheduling.

Client
The Ministry of Defense for a Southeast Asian country.

Approach
This project required a mix of high-end optimization modeling and application development that would be compatible with the other modules of the Integrated Ammunition Management System (IAMS). Three possible alternative solutions were evaluated to meet the client's requirements.

1. ' Off The Shelf ' (OTS)
Scheduling packages
with embedded Algorithm
2. Customized algorithm
built on OTS Mathematical
Tools
3. End-to-end Customized
Solution (no use of external
tools or algorithm)
Suitability to client's
requirements
Low, lots of unwanted features Can be made highly suitable High
Time to implement Low Low High
Risk Low High High
Price Low Low High
Evaluations of Possible Approaches for Developing iScheduler

The optimization algorithm used constraint programming search tree with the ILog Scheduler and ILog Solver. The iScheduler (our scheduling application) also allowed generation of what-if scenarios to facilitate analysis.

Solution

The iScheduler represented the optimized schedules and the what-if analysis results in the form of Gantt charts.

Benefits
The iScheduler improved the schedule compliance of the system and allowed monitoring of critical system resources. It improved the resource utilization and provided early warning for capacity shortfalls.

Related Links
Case Studies
Download pdf version (443 kb)

Other Case Studies
Transport Scheduling and Rostering
Scheduling and Optimization
Rostering And Optimization

thoughtpost - future